VIC a | 2704 | Latrobe University BS1 Building - Nursing & Midwifery Project - Herkese Açık Proje Sahası
-
10th Ekim 2025, Subcontractor Meeting – Time Change to 11:30 AM
Hi All,
Please note that today’s subcontractor meeting has been rescheduled from 11:00 AM to 11:30 AM.
Location remains the same.
Thank you for your understanding.
Kind regards,
Joseph Younes
Contract Administrator -
07th Ocak 2025, KANE KPS arete General induction update
We would like to inform you that the Kane/arete/KPS induction has been updated to reflect the latest legislation updates and requirements. As a result, all workers on site must complete the updated induction by February 21st, 2025.
Please note that the induction may take some time to complete, and workers will begin this process on January 14h, 2025. It is essential that all workers complete the induction by the specified deadline.
In cases where additional language support is needed, a translator must be present to assist workers during the induction process. The translator will also be responsible for signing off the induction once completed.
We appreciate your cooperation in ensuring this update is completed on time. If you have any questions or need further assistance, please feel free to reach out. -
26th Ağustos 2024, NATIONAL SAFETY CAMPAIGN – Other Lifting Equipment: Excavators, Telehandlers etc.
What are other forms of ‘Lifting Equipment’?
Ekler :
‘Other Lifting Equipment’ refers to plant, other than a crane, which has also been designed and manufactured to function as lifting equipment, as well as the function it is primarily intended for.
Plant and/or equipment that is typically considered as ‘Other Lifting Equipment’ includes:
• Earthmoving Plant, such as an Excavator
• Telehandlers
• Forklift
Kane Education Alert 1300.14 Lifting Operations - Other Lifting Equipment - National Safety Campaign.pdf
Geçerli Saha Hava Durumu
Son Güncelleme Saati: 07:21
Sıcaklık: 14C (App 12C)
Rüzgar Hızı: 15KMH
Maks. Rüzgar: 17KMH @05:21
Saat 9'dan beri yağmurlu: 0,0mm
Min Sıcaklık: 13C @06:36
Maks Sıcaklık: 22C @14:32 1.01.2026
Bora: 19KMH
Maks Bora: 20KMH @04:21
Gözlem Konumu - Melbourne Airport, VICTORIA
Zaman Dilimi - Doğu Avustralya Standart Saati
Tahmin - Cuma, 2 Ocak
Possible storm.
Min: 15C Maks: 32C
Yağmur İhtimali: 30%
Beklenen Yağmur: 0 kime 1mm
Tahmin Konumu - Tullamarine, VICTORIA
Zaman Dilimi - Doğu Avustralya Standart Saati
Yarın - Cumartesi, 3 Ocak
Cloudy.
Min: 14C Maks: 22C
Yağmur İhtimali: 30%
Beklenen Yağmur: 0 kime 1mm
Bu sahanın KKD Gereksinimlerini biliyor musunuz?
Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.
Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.
Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.
Bu sahanın KKD Gereksinimlerini biliyor musunuz?
Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.
Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.
Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.