VIC | 2717 | Cobblebank Community Services Hub
Buletine recente
  • 28th iulie 2025, Ant Rid in sheds

    Please note that ant rid has been placed in all sheds today on site. Please do not throw out or disturb bait stations which have also been labelled.

  • 07th ianuarie 2025, KANE KPS arete General induction update

    We would like to inform you that the Kane/arete/KPS induction has been updated to reflect the latest legislation updates and requirements. As a result, all workers on site must complete the updated induction by February 21st, 2025.

    Please note that the induction may take some time to complete, and workers will begin this process on January 14h, 2025. It is essential that all workers complete the induction by the specified deadline.

    In cases where additional language support is needed, a translator must be present to assist workers during the induction process. The translator will also be responsible for signing off the induction once completed.

    We appreciate your cooperation in ensuring this update is completed on time. If you have any questions or need further assistance, please feel free to reach out.

  • 26th august 2024, NATIONAL SAFETY CAMPAIGN – Other Lifting Equipment: Excavators, Telehandlers etc.

    What are other forms of ‘Lifting Equipment’?
    ‘Other Lifting Equipment’ refers to plant, other than a crane, which has also been designed and manufactured to function as lifting equipment, as well as the function it is primarily intended for.
    Plant and/or equipment that is typically considered as ‘Other Lifting Equipment’ includes:
    • Earthmoving Plant, such as an Excavator
    • Telehandlers
    • Forklift

    Anexe :
    Kane Education Alert 1300.14 Lifting Operations - Other Lifting Equipment - National Safety Campaign.pdf
Prognoza meteo șantier
Condiții meteo curente la șantier

Ultima actualizare la: 07:21
Temperatură: 14C (Aplicație 12C)
Viteza vântului: 15KMH
Max. Vânt: 17KMH @05:21
Ploaie de la 9 AM: 0,0mm
Temp min: 13C @06:36
Temp max: 22C @14:32 01.01.2026
Rafală: 19KMH
Rafală max: 20KMH @04:21


Observație obținută de la - Bureau of Meteorology
Locație observație - Melbourne Airport, VICTORIA
Fus orar - Ora standard a Australiei Orientale
Prognoză - vineri, 2 ianuarie

Possible storm.
Min: 15C Max: 33C
Șanse de ploaie: 30%
Precipitații așteptate: 0 la 1mm


Prognoză obținută de la - Bureau of Meteorology
Locație prognoză - Melton, VICTORIA
Fus orar - Ora standard a Australiei Orientale
Mâine - sâmbătă, 3 ianuarie

Cloudy.
Min: 13C Max: 24C
Șanse de ploaie: 30%
Precipitații așteptate: 0 la 1mm


Documente importante aferente locației
Nou în locație?

Cunoașteți cerințele EIP pentru acest șantier?

Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.

Vizualizare cerințele șantierului privind IPE

Începeți să lucrați mai devreme atunci când ajungeți în locație.

Finalizați înregistrarea la șantier online când doriți și economisiți timp.

Începeți înregistrarea

Nou în locație?

Cunoașteți cerințele EIP pentru acest șantier?

Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.

Vizualizare cerințele șantierului privind IPE

Nou în locație?

Începeți să lucrați mai devreme atunci când ajungeți în locație.

Finalizați înregistrarea la șantier online când doriți și economisiți timp.

Începeți înregistrarea

;